IRC terms glossary: framing, egress, stairs and flashing
The B1 is open book, so you will not be asked to recite the IRC. You will be asked to tell similar things apart, such as a rafter tie and a collar tie or a guard and a handrail, and then to find the rule for the one you picked. This glossary groups twenty of those terms by the part of the house they belong to. Each row says what to remember and links a page that explains the term in our own words, with a drawing and the usual mix-ups. Nothing here quotes the code. Open your own IRC for the text.
Roof framing
| Term | What to remember |
|---|---|
| Rafter ties vs ceiling joists | A low tie holds the rafter feet together; parallel ceiling joists fastened at the plate can serve as one. |
| Collar ties | Set high in the attic and resist uplift, not outward thrust. |
| Ridge board vs ridge beam | A board aligns rafters that carry each other; a beam carries them and needs posts. |
| Roof pitch | Rise in 12 inches of horizontal run; 6:12 is about 26.6 degrees. |
Wall framing
| Term | What to remember |
|---|---|
| Braced wall panel | The full-height braced piece of wall inside a braced wall line. |
| Wall header | The member that spans an opening, sized from the tables by span and load. |
| King stud vs jack stud | Jack studs are short and carry the header; king studs run full height beside them. |
| Cripple wall | A short framed wall between foundation and floor, not the same as a cripple stud. |
| Bearing wall vs non-bearing wall | Bearing walls carry load from above; check joist direction and what rests on the wall. |
Try one question
Question 1 of the free 10-question check on ICC B1. No signup. Then ask Plumb, the AI study assistant, why the answer is right and the others are wrong.
Public Safety and Special Construction
In a new bedroom, the only emergency escape window has a keyed sash lock, with the key hanging on a hook beside the window. What should the inspector do?
Press A-D or 1-4 to choose an answer while this question is on screen.
Choose an answer to begin
Floors and foundations
| Term | What to remember |
|---|---|
| Sill plate | The first wood on the foundation, anchored down and protected against decay. |
| Band joist | Closes the joist ends at the edge of the floor and carries wall load to the plate. |
| Notching and boring joists | Notch location along the span, notch depth and hole size are all limited. |
| Footing vs foundation wall | The footing spreads load to soil; the wall carries it down to the footing. |
Ask Plumb before you buy AI your AI study assistant
See what's on the ICC B1 exam, test yourself with 5 quick questions, or find the plan that fits you.
The ICC B1 course
Available now · instant accessLearn how the IRC is laid out, drill finding sections fast, then practice. Written for the 2024 IRC.
- 7modules of lessonsEvery task on the outline
- 4full-length timed exams60 questions in 120 minutes each
- 426practice questionsEach one explained
- 4worked calculationsStep by step
- 8timed code lookups a setFind it fast in IRC, with your median time
- 1week-by-week study planSet to your exam date
Turn a practice answer into a study step. In untimed practice, ask Plumb AI about any question you answer, follow up, then see your weakest topics and what to drill next.
Instant access. Terms and refunds · Secure checkout by Stripe · Billed by Nori Software
Every answer comes with a full explanation.
Fire protection
| Term | What to remember |
|---|---|
| Fireblocking vs draftstopping | Fireblocking closes small hidden spaces; draftstopping divides large ones. |
Egress and stairs
| Term | What to remember |
|---|---|
| Egress window | Four limits at once: clear area, clear height, clear width and sill height. |
| Net clear opening vs rough opening | The limits apply to what you can pass through, not to the framed hole. |
| Guard vs handrail | A guard is a barrier at an open side; a handrail is a grip along a stair. |
| Winder stairs | Depth is measured on the walkline, a set distance in from the narrow side. |
Flashing
| Term | What to remember |
|---|---|
| Flashing | Lap upper over lower so water runs out and never behind a joint. |
| Step flashing vs counterflashing | Step pieces are woven into shingles; counterflashing caps the flashing below. |
How to use the glossary
Read a pair, then say the difference aloud in one sentence. If you cannot, open the page again. Then find the matching section in your own IRC and tab it, using the IRC tab list as a guide. The 2024 edition renumbered part of Chapter 3, including egress and stairs, so tab by name and confirm the number. The IRC chapters guide shows which chapter holds which topic, and the span table guide covers the tables behind headers, joists and rafters.
Four free tools sit next to these terms. The egress opening check and the IRC stair check work the numbers for windows and stairs, the rafter length calculator turns pitch and run into a rafter length, and the code navigation drill trains you to find a section against a clock.
Know the terms? Check the rest of the B1
Take the free 10-question check. It is weighted to the seven B1 areas, scored by area and needs no signup, so you see which area costs you the most points. The Rafter Tie course adds timed practice exams, a lesson for each outline area and a study plan built from your exam date.
Sources
Show the list
- B1 Residential Building Inspector Content Outline, International Code Council.
- 2021 IRC contents and 2024 IRC contents, International Code Council. Chapters are named, not quoted; open your own copy for the text.
Facts come from the sources listed above. If something has changed, tell us and we will correct it within 2 business days.
Your next step
Ready to see where you stand on ICC B1?
Free, untimed and scored by domain. No signup.
Start the free 10-question checkB1 course with IRC navigation drills. Lessons, timed practice exams and a plan around your exam date. Get B1 course with IRC navigation drills · $99 See the plans or read the free sample lesson.Terms and refunds
Want a timed run? Try the free 25-question mini-mock. The first 5 need no email.
Prefer paper? Free printables
- Print the study checklist (free PDF). Topics to cover, on one printable page. No email.
- Print a class quiz (free PDF). 5 practice questions with an answer key on page 2.
- Print the flashcards as cut-out cards (free PDF). The free flashcard sample, ready to cut and carry.
From the blog
- ICC B1 exterior coverings and weather barriers
- ICC B1 30-day study plan for people in the trades
- Rafter ties vs collar ties: what inspectors check