Collar ties: what it means on an inspection
A collar tie is a horizontal board joining opposing rafters high in the attic space, near the ridge. It keeps the two sides of the roof from pulling apart under wind uplift. It is not the member that stops the walls spreading; that is the rafter tie or the ceiling joists lower down.
Use this diagram
How to check a collar tie
- Find the height. Stand in the attic and look at where the board sits between the plate and the ridge. A collar tie sits high, near the ridge, within the zone the code sets. If a board sits low, near the plates, it is behaving as a rafter tie, and the question changes.
- Check that it joins opposing rafters. A collar tie works as a pair connector. A board nailed to one rafter, or to rafters that are not opposite one another, is not doing the job.
- Look for spacing. Collar ties are not needed on every pair in many roofs, and the code sets how often they are needed. Read the spacing rule in your edition; do not assume every rafter pair gets one.
- Check the fasteners. The board resists a pull along its length, so the nailing at each end is what counts. Compare it with the connection requirement in your code book.
- Do not count it as a rafter tie. A board high in the attic adds little against outward thrust. The code asks for collar ties because of uplift.
Try one question
Question 1 of the free 10-question check on ICC B1. No signup. Then ask Plumb, the AI study assistant, why the answer is right and the others are wrong.
Public Safety and Special Construction
In a new bedroom, the only emergency escape window has a keyed sash lock, with the key hanging on a hook beside the window. What should the inspector do?
Press A-D or 1-4 to choose an answer while this question is on screen.
Choose an answer to begin
Common mix-ups
- Collar tie versus rafter tie. Height is the quick test. Low and holding the rafter feet together is a rafter tie. High and joining the two roof planes is a collar tie. A roof usually needs the low tie and may also need collar ties.
- Collar tie versus ridge strap. A ridge strap is a metal connector across the ridge, not a board between rafters. Check your edition before you accept one in place of collar ties.
- Collar tie versus purlin brace. A purlin brace carries rafter load down to a wall. A collar tie only holds the roof planes together.
- More collar ties do not fix missing rafter ties. Adding boards high in the attic leaves the walls with nothing resisting outward thrust.
Ask Plumb before you buy AI your AI study assistant
See what's on the ICC B1 exam, test yourself with 5 quick questions, or find the plan that fits you.
The ICC B1 course
Available now · instant accessLearn how the IRC is laid out, drill finding sections fast, then practice. Written for the 2024 IRC.
- 7modules of lessonsEvery task on the outline
- 4full-length timed exams60 questions in 120 minutes each
- 426practice questionsEach one explained
- 4worked calculationsStep by step
- 8timed code lookups a setFind it fast in IRC, with your median time
- 1week-by-week study planSet to your exam date
Turn a practice answer into a study step. In untimed practice, ask Plumb AI about any question you answer, follow up, then see your weakest topics and what to drill next.
Instant access. Terms and refunds · Secure checkout by Stripe · Billed by Nori Software
Every answer comes with a full explanation.
Collar ties on the B1
Collar ties sit in the roof and ceiling area, which is 14% of the B1, in Chapter 8 of the IRC. The usual question asks you to tell the tie types apart from a description, or to place a tie at the right height. Look the topic up by name in your chapter table of contents and write the section number in your own book once you have confirmed it for your edition.
Practice it
Compare the two kinds of tie again on the rafter ties versus ceiling joists page, then read ridge board versus ridge beam to see why a ridge beam changes the tie question. When you can describe a roof's load path in three sentences, use the span table guide to check rafter and joist sizes, or return to the IRC terms glossary.
Know your collar ties? Check the rest of the B1
Take the free 10-question check. It is weighted to the seven B1 areas, scored by area and needs no signup, so you see which area costs you the most points. The Rafter Tie course adds timed practice exams, a lesson for each outline area and a study plan built from your exam date.
Sources
Show the list
- B1 Residential Building Inspector Content Outline, International Code Council.
- 2021 IRC contents and 2024 IRC contents, International Code Council. Chapters are named, not quoted; open your own copy for the text.
Facts come from the sources listed above. If something has changed, tell us and we will correct it within 2 business days.
Your next step
Ready to see where you stand on ICC B1?
Free, untimed and scored by domain. No signup.
Start the free 10-question checkB1 course with IRC navigation drills. Lessons, timed practice exams and a plan around your exam date. Get B1 course with IRC navigation drills · $99 See the plans or read the free sample lesson.Terms and refunds
Want a timed run? Try the free 25-question mini-mock. The first 5 need no email.
Prefer paper? Free printables
- Print the study checklist (free PDF). Topics to cover, on one printable page. No email.
- Print a class quiz (free PDF). 5 practice questions with an answer key on page 2.
- Print the flashcards as cut-out cards (free PDF). The free flashcard sample, ready to cut and carry.
From the blog
- ICC B1 roof and ceiling construction: what to know
- ICC B1 exterior coverings and weather barriers
- ICC B1 smoke alarms, safety glazing and flame spread